盖挖逆作施工过程中城际铁路运营与地下结构的动力响应
张骏
Dynamic performance of underground structure and operation performance of intercity railway in top-down inverse construction process
ZHANG Jun
北京交通大学学报 . 2013, (3): 79 -86 .  DOI: 10.11860/j.issn.1673-0291.2013.03.015